Tenant improvement electrical in Calgary.
A tenant improvement lives or dies on the schedule. The landlord has an occupancy date, the tenant has a lease start, and the electrical sits right in the middle of the trade stack: demo, rough-in, inspection, board, ceilings, devices, final. If electrical slips, everyone behind it slips.
AmpCity Electrical wires office, retail, restaurant, clinic and light-industrial fit-outs across Calgary and Airdrie as a subcontractor to general contractors, or directly for tenants and landlords. A Master Electrician prices the job from your drawings and is responsible for it through to the closed permit.
What’s included
- Make-safe and demolition of existing circuits
- New panels, sub-panels and feeder changes
- Lighting layouts, controls and occupancy sensors
- Receptacles, dedicated circuits and furniture feeds
- Kitchen and equipment connections for restaurants
- Exit and emergency lighting to the occupancy
- Data, low-voltage and access-control rough-in
- Permit, inspection, as-builts and panel schedules
Priced from your drawings
Send the electrical drawings, or the architectural set if the electrical is still design-build, and the schedule. You get a written price that lists what is included and what is not, so there is nothing to argue about at the change-order stage.
If the drawings leave something open, such as existing panel capacity, a ceiling we cannot see above, or equipment loads nobody has confirmed yet, we raise it as a question before the bid rather than as an extra after it.
Built to your schedule
We quote against your construction schedule, not a general availability window. Rough-in is staged so the inspection is booked before your drywall crew arrives, and we tell you before bid close if we cannot staff your dates.
Work that cannot happen during business hours, such as shutdowns, tie-ins to a live base building or noisy core drilling, is scheduled for evenings or weekends with the building manager.
Paperwork that closes out cleanly
The electrical permit is pulled under our contractor licence. Our certificate of insurance and WCB Alberta clearance letter go in with the bid, not three weeks after you ask for them. At the end you get updated panel schedules and as-built mark-ups, and the permit is closed.
Tenant improvements: common questions
Do you work as a subcontractor to general contractors?
Yes. Most tenant improvement work comes to us through GCs. We carry our own licence, WCB coverage and $5M liability insurance, and the certificates go in with the bid.
Can you price design-build electrical?
Yes, on smaller fit-outs. We lay out the lighting and power to suit the tenant, confirm the load against the existing service, and price the result. Larger or sealed-drawing jobs stay with the engineer of record.
How quickly can you turn a price around?
Most tenant improvement packages are priced within a few business days of receiving drawings. If the bid date is tighter than that, tell us when you send them.
Do you work in occupied buildings?
Yes. Noisy or disruptive work and shutdowns are booked after hours with building management, and we keep the space safe and tidy at the end of every shift.